Full structural demolition or exterior teardown
→ /demolition / project review

Commercial retail unit whitebox · Calgary
Strip the vacated unit to the landlord’s agreed shell — without standing down the rest of the job.
Aztec whiteboxes commercial retail units in Calgary so landlords and property managers can hand a clean shell to the next tenant. Labour-based interior strip-out: partitions, finishes, ceilings, flooring, fixtures, and abandoned improvements out to the condition the lease or landlord standard requires. Hazardous materials handled in the same scope when the report calls for them.
Commercial • Retail CRU • Multi-tenant • Active job sites
Whiteboxing a commercial retail unit (CRU) means stripping a vacated tenant’s interior improvements down to the landlord’s agreed shell condition so a new tenant can start their fit-out. On Aztec scopes that usually means non-structural partitions, drywall finishes, suspended ceilings, flooring, millwork, fixtures, and abandoned tenant improvements removed to the standard set by the lease or landlord — not a full building demolition, and not a full tenant-improvement buildout. Aztec does that labour-based strip-out on Calgary commercial sites; when a hazardous-material report is in play, abatement can sit in the same scope. The work is planned so other trades on an active job keep moving. Occupied floors and operating buildings are work we can also do when access and hours allow — the lead is keeping the site moving, not shutting it down.
Send drawings or a photo. Call 403-807-7788.
The unit is empty. The lease clock is not.
A commercial retail unit sitting in yesterday’s fit-out burns leasing time. Landlords and property managers need the abandoned improvements out and the unit brought to the white-box or base-building condition the property requires — then the next TI crew can start.
Aztec is the crew for that dirty middle: strip-out, cleanup, and hazmat when present. Not the full TI encyclopedia. Not a relationship pitch for “whenever something comes up.” That stays on /property-managers.
Scope specificity
Typically in scope (subject to drawings, structure, and landlord standard):
Final scope depends on structural requirements, active building systems, access, and the condition required by the property owner or lease.
Not this page
→ /demolition / project review
→ /abatement / /asbestos-pipe-cutting as relevant
Keep the job moving
Aztec leads with active job sites. Whitebox and strip-out scopes are planned around loading, elevator use, work hours, dust control, and the trades that still need the corridor. The product is the schedule kept — the unit ready without standing everyone else down.
Occupied buildings and operating floors are a “we can also”: access, separation, and hours get reviewed with the property team. They are not the hero story on this page.
How it works
Floor plan, photos of the vacated CRU, lease turnover / landlord white-box standard if you have it, and any hazmat report.
Aztec reviews what must stay, what comes out, and whether abatement sits in the same scope.
Labour-based selective demolition and cleanup to the agreed condition.
Unit ready for the next tenant improvement or base-building phase; other trades not left waiting on a vague mid-scope.
One dirty-work crew
Aztec already does labour-based commercial demolition and hazardous-material abatement. A CRU whitebox is that trade applied to landlord turnover: one crew for the strip, and hazmat in the same conversation when the report says so.
Related: commercial demolition, hazardous-material abatement, property managers, projects.
Straight answers
Aztec Group whiteboxes vacant commercial retail units in Calgary for landlords and property managers — labour-based strip-out to the agreed shell so the next tenant can start their fit-out. Send drawings or a photo, or call 403-807-7788.
White-box (or whitebox) condition means the vacated unit is stripped to a clean, basic shell ready for leasing or the next tenant improvement. The exact standard — what stays, what goes, finish level — is set by the landlord, the lease, and the property. Aztec scopes to that standard; we do not invent a one-size shell.
A strip-out is the physical removal of tenant improvements (partitions, finishes, fixtures, abandoned work). A whitebox is the target condition that strip-out is aiming at — the landlord’s agreed shell. On this page, Aztec owns both the strip and the handoff to that condition. Full TI buildout after the shell is ready is not this division.
Yes, when a hazardous-material report (or discovery during the job) requires it. Abatement can sit in the same Aztec scope as the strip-out so the landlord is not coordinating two vendors for the dirty middle. Sequencing and controls are project-specific.
No — that is the point of how Aztec plans the work. Whitebox scopes on active sites are reviewed for access, loading, hours, and dust so other trades keep moving. Occupied areas can be worked around when the property team sets the rules; say so when you send the drawings or photo.
Cheap next step
Floor plan, a phone photo of the vacated unit, or the landlord’s white-box standard is enough to start. Call 403-807-7788 or email estimates@aztecgroup.ca.
Aztec Group Ltd.
300, 160 Quarry Park Blvd. SE
Calgary, AB T2C 3G3
403-807-7788 · estimates@aztecgroup.ca
https://www.aztecgroup.ca